2 layout, 1 layout sg series 225 & 300, Layout – GE Industrial Solutions SG Series 225 & 300 Installation Guide User Manual

Page 9: Layout sg series 225 & 300, 14 3 2 cr xa xb pa

Advertising
background image

2 LAYOUT



2.1 LAYOUT SG Series 225 & 300

SGS_225-300_S2_U

PS_GE_02

Fig. 2.1-1 SG Series 225 & 300 general view

SGS_225-

300_S2_U

PS_03

0 OFF

Q2

I O

N

Q1

I O

N

0 OFF

4

3

2

1

2

Modifications reserved

Page 9/40

OPM_SGS_ISG_M22_M30_2US_V010.doc

Installation Guide SG Series 225 & 300 UL S2

3

4

1

4

3

2

1

15

14

13

12

9

8
20

19

5 6 7
17

16

18

21

10

22

11

Fig. 2.1-2 SG Series 225 & 300 general view with open doors



SGS_225-3

00_S2_UP

S_04

0 OFF

Q1

I O

N

I O

N

Q2

0 OFF

1

4

3

2

CR

XA

XB

PA

10

20

19

9

8

21

7
18

6
17

11

22

1 6

4

3

15

14

5

1 2

1 2

13

1
2

3
4

2

1

3
4

Fig. 2.1-3 SG Series 225 & 300 general view with optional 5

th

harmonic filter

and removed protection panels

1

Opening for top cable entry

(*)

2

Opening for bottom cable
entry

3

Compression lugs for Utility
input and Load output

4 Compression lugs for

external Battery
connection

CR Connectivity

Rack

PA 24Vdc Auxiliary Power

Supply

XA Terminals for 24Vdc

Auxiliary Power Supply
connection

XB Terminals for EPO

connection

*)

Remove this panel or
provide means to capture
metal filings from cutting
conduit entry holes.

Advertising