Dc link reactor connection, Auxiliary controlpower supply connection – GE Industrial Solutions AF-300E$ User Manual

Page 41

Advertising
background image

4-10

*

40 - 300 Hp typical fuse 10 amp

(similar to Gould A60Q10-2)

*

*

Figure 4-8. AUXILIARY CONTROL POWER SUPPLY CONNECTION

DC Link Reactor Connection

A DC Reactor is required on all AF-300 drives rated 100 Hp
and above. This reactor is included in the purchase of the
drive and shipped with the drive. This reactor must be
installed or the warranty will be voided.

1.

Remove the jumper between the "P+" and "P1"
terminals (if required.)

2.

Connect DC Reactor between these terminals as
shown in Figure 4-4 (see Table 4 for wire sizing.)

Figure 4-9. DC LINK REACTOR CONNECTION
(100 Hp AND GREATER)

Auxiliary ControlPower Supply Connection

DC Link Reactor Dimensions

Weight

Height

Width

Depth

Watts

HP

Lbs.

KG

Inches

MM

Inches

MM

Inches

MM

Loss

100

55

25

9.85

250

7.88

200

5.95

151

95

125

70.6

32

11.03

280

8.67

220

6.7

171

94

150

88

40

14.17

360

7.48

190

6.97

177

100

200

99

45

13.79

350

8.67

220

6.7

171

115

250

110

50

12.21

310

9.06

230

7.13

181

140

300

110

50

12.61

320

9.06

230

7.9

201

160

DETACH THE FACTORY INSTALLED JUMPER (IF REQUIRED)

When using the circuit shown in Figure 4-8, it is necessary
to connect terminals "RO" and "TO" to the line side of the
MC Contactor.

CAUTION: Do not neglect to make these connections.

If not made, continuous cycling of the MC Contactor may

occur that will stress (or fail) the charge resistor and DC

link capacitors.

CAUTION: The RO and TO terminal control power cannot

be separate or isolated from the main AC power.

AF-300E$

MAIN POWER

INPUT

Advertising