GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Operating Manual User Manual
Page 52

Modifications reserved
Page 52/83
OPM_SGS_USM_10K_40K_0US_V030.doc
Operating Manual SG Series 10 –20 – 30 - 40 kVA
7.2.4 Restore to normal operation after EPO (Emergency Power Off)
UPS panel after activation of EPO
(Emergency Power Off) with Utility
not available, i.e. complete
shutdown of the UPS.
In this case wait until Utility is
again available, then proceed to
restart the UPS as described
below. Points 1 through 3.
UPS panel after activation of EPO
(Emergency Power Off) with Utility
available.
•
All Contacts are open.
•
Rectifier, Inverter and Static-Switch
shutdown.
1. Reset the EPO (Emergency Power Off)
button.
• Press mute, to reset alarm and buzzer.
2. Press “inverter off” ( O ) key.
• Rectifier starts with blinking LED.
• At the end of Soft-start the LED
remains lit.
•
The LCD screen shows: “LOAD OFF”.
3. Press “inverter on” ( I ) key.
• Inverter starts with blinking LED.
• At the end of Soft-start the LED
remains lit.
UPS output LED and LCD screen
indicate both: “LOAD ON INVERTER”.
END OF PROCEDURE