663 / 664E Installation Guide

CC848921016 r02 December 2012

Page 7

Step 2

Ground Chassis


Chassis Ground

• Vertical or horizontal chassis ground cable

landings are threaded holes 1/4-20 on 5/8 inch

centers

Torque to 240 in-lb

• Chassis ground connections are available if

customer standards require the power system to

have an independent grounding connection. The

manufacturer does not require this connection

when the relay rack or cabinet housing power

system is properly grounded to maintain product

operation or product warranty


NOTE: Failure to properly ground the power system is

hazardous to site personnel and can damage

the power system circuit cards and converter

modules. It may void the power plant warranty.

Step 3

Run and Terminate dc Input Connections

• Loosen captive hardware
• Remove cover by sliding to the left and back.
• Input supply and return lug landings are 1/4-20

on 5/8 inch centers

Torque to 240 in-lb

• Flex cable is recommended for sizes larger than

No. 2 AWG

• Narrow tough lugs are required for lug sizes

larger than No.2 AWG

• Supply and return tabs are staggered for ease of

cabling

• Cabling exists to the left when facing the rear of

the system

Chassis Ground

Connections

Loosen captive screws

Rear Cover

Supply and return connections

Advertising