New prod uc t ah1898 – Diodes AH1898 User Manual

Page 6

Advertising
background image

AH1898

Document number: DS36028 Rev. 1 - 2

6 of 11

www.diodes.com

February 2013

© Diodes Incorporated

NEW PROD

UC

T

AH1898

Application Note

(cont.)

Bands Select Change Timing and Valid Output
Whenever band selection BSEL pin input is changed, allow for band selection changeover to complete and stabilize. The output is valid only
after the second complete operating ‘awake’ phase. Time taken for the output to be valid, after the BSEL change, depends on timing of BSEL
change during the sleep and awake phase; this transition time (t

BAND

) can range from 100ms typical and 200.1ms maximum.


Advertising