Step 4 - electrical wiring, Warning, Circuit board layout – Xylem MM 414B Series 150E and 157E Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications User Manual

Page 10: Probe connections, 60 second adjustable burner off delay, Burner terminals pump terminals, Probe led's

Advertising
background image

10

STEP 4 - Electrical Wiring

• To prevent electrical shock, turn off the electrical power before making electrical connections.

• This low water cut-off must be installed in series with all other limit and operating controls installed on the

boiler. After installation, check for proper operation of all of the limit and operating controls, before leaving
the site.

• Boiler manufacturer schematics should always be followed. In the event that the boiler manufacturer’s

schematic does not exist, or is not available from the boiler manufacturer, refer to the schematics provided
in this document.

Failure to follow this warning could cause electrical shock, an explosion and/or a fire, which could result in
property damage, personal injury or death.

!

WARNING

L

Cover Removal and Installation Procedure

a. To remove cover, use a flatblade screwdriver to

loosen screws and remove the cover (K).

b. To reconnect cover, slide over brackets and tighten

screws using a flatblade screwdriver.

c. Following the appropriate wiring diagram (refer to

page 11) based on your application requirements,
and using BX armored cable or Thinwall electrical
metal tubing connector fittings, make electrical
connections to the junction box (L).

IMPORTANT: There must be a minimum space
of 2” (13mm) between connector fittings and
electrical live metal parts.

Circuit Board Layout

BCOM

BNC

BNO

PCOM

PNC

PNO

N

H

BCOM

BNC

BNO

PCOM

PNC

PNO

N

H

60

30

Secs

.

0

60

30

Secs

.

0

BCOM

BNC

BNO

PCOM

PNC

PNO

N

H

0

60

30

Secs

.

0

Probe Connections

Bottom

Red

Middle

Yellow

Top

Blue

0-60 Second Adjustable
Burner Off Delay

110 Volt Input

from Boiler

Circuit

Manual Reset

(If applicable)

Low Water

LED

Red

Power

LED

Green

Test

Switch

Burner

Terminals

Pump

Terminals

BCOM

BNC

BNO

PCOM

PNC

PNO

N

H

Probe LED's

K

Advertising