GENERAL – FINAL CHECK LIST

___ 1. Is the unit base properly leveled, grouted and

secured?

___ 2. Are all lubrication points properly lubricated?

___ 4. Is the shut-off valve to the pump suction open?

___ 5. Is the shut-off valve on the discharge line open?

___ 6. Is the piping properly supported so as to pre-

vent strains on unit?

___ 7. Is the distribution system purged of debris and

air? Is the system filled?

___ 8. Are the pump and driver shafts properly

aligned?

___ 9. Is the pump rotation correct?

___ 10. Is there adequate ventilation and air circulation?

___ 11. Have all piping connections been made? Have

all flanged joints been checked for tightness?

___ 12. Has an automatic air release valve been

installed on the top of the casing of each hori-

zontal split case pump?

___ 13. Are remote alarm and control panels connected

and in operation as required by NFPA 20?

___ 14. Are pump bearings properly lubricated?

___ 15. Is coupling properly lubricated, if required?

DIESEL INSTALLATION – FINAL CHECK LIST

ELECTRIC DRIVEN INSTALLATION – FINAL CHECK LIST

___ 1. Have all electrical connections been made bet-

ween engine terminal block and the controller?

___ 2. Has engine cooling system been filled with 50%

water and 50% antifreeze solution?

___ 3. Has diesel fuel supply tank been properly

installed in accordance with the requirements of

NFPA 20? Has vent pipe been installed?

___ 4. Have both fuel ‘supply’ and ‘return’ connections

been made to fuel tank?

___ 5. Has fuel tank been filled with No. 2 diesel fuel?

___ 6. Has oil been added to the engine crankcase as

per diesel manufacturer’s recommendations?

___ 7. Does air cleaner require servicing?

___ 8. Has proper power been supplied to the diesel

controller of adequate amperage as recom-

mended by the controller manufacturer?

___ 9. Have batteries been installed, serviced and cables

connected? Are the batteries fully charged?

___ 10. Has proper power been supplied to the diesel

water jacket heater of adequate amperage and

voltage as recommended by the diesel

manufacturer?

___ 1. Has the casing relief valve been installed

between the pump discharge and check valve?

___ 2. Are proper electrical connections made to the

control panel and motor (proper voltage and

adequate size)?

CAUTION: Stuffing Box Damage may occur. Do

not run pumps dry. Fill and vent the pump volute

prior to operation. FAILURE TO FOLLOW THESE

INSTRUCTIONS COULD RESULT IN PROPERTY

DAMAGE AND/OR MODERATE PERSONAL

INJURY.

DANGER: Charge batteries in a well-ventilated

area. FAILURE TO FOLLOW THESE INSTRUC-

TIONS WILL RESULT IN SERIOUS PERSONAL

INJURY, DEATH, AND/OR PROPERTY DAMAGE.

CAUTION: Do not connect power until diesel

engine is filled with coolant or the heater may

burnout. FAILURE TO FOLLOW THESE INSTRUC-

TIONS COULD RESULT IN PROPERTY DAMAGE

AND/OR MODERATE PERSONAL INJURY.

WARNING: Rotating shafts can catch loose

clothing. Do not operate the pump without all

guards in place. FAILURE TO FOLLOW THESE

INSTRUCTIONS WILL RESULT IN SERIOUS PER-

SONAL INJURY, DEATH, AND/OR PROPERTY

DAMAGE.