MAINTENANCE

SCHEDULE:

• Blow down weekly (at least once) when the

boiler is in operation.

• Disassemble and inspect annually. Replace

the low water cut-off if it is worn, corroded,

or if components no longer operate properly.

• Inspect the float chamber and equalizing

piping annually. Remove all sediment

and debris.

• Replace every 10 years. More frequent replace-

ment may be required when severe conditions
exist such as rapid switch cycling, surging water
levels, and use of water treatment chemicals.

PROCEDURE:

1. Blow down the low water cut-off when the

water level is at its normal level and the
burner is on. Fully open the blow down
valve and observe the water level fall in the
gauge glass. Close the valve after verifying
that the feeder contacts have closed and
the burner shuts off. If this does not happen,
immediately shut off the boiler and correct
the problem.

To prevent serious personal injury from steam and hot
water, make sure there is a discharge line from the
blow down valve to a proper place of disposal.

Failure to follow this caution could cause
personal injury.

!

CAUTION

INSTALLATION COMPLETE

For All Installations

BOTTOM

TOP

LEFT

RIGHT

The BX outlet (GG) on the control is movable
into any of the four positions by simply
removing the two black-headed screws and
rotating the housing.