Xylem MM 201H Series 67 and 767 Low Water Cut-Offs For Steam Boilers User Manual

Page 5

Advertising
background image

h. Insert the tubing (Q) into the upper compres-

sion fitting (U) and tighten the fitting to 31 ft•lb
(42 N•m).

U

Q

g. Position the tubing (Q) next to the compression

fitting (K) and, using a pencil, mark the tubing
(Q) for proper insertion into the compression
fitting (K).

Remove the tubing (Q), and, using the tube

cutter, cut the tubing to its proper length.

Q

K

5

i. Using two (2) pipe wrenches, rotate the upper

tee (P) counterclockwise and the lower tee (J)
clockwise.

j. Place the compression nut (R) and the compres-

sion ring (S) over the bottom of the tubing (Q).

P

J

Q

S

R

Advertising