heated pump cautiously. It is recommended that
the pressure relief valve assembly be replaced at
each overhaul, or any time the pump casing over­
heats and activates the valve. Never replace this
valve with a substitute which has not been speci­
fied or provided by the Gorman‐Rupp Company.

Strainer Check

If a suction strainer has been shipped with the
pump or installed by the user, check the strainer
regularly, and clean it as necessary. The strainer
should also be checked if pump flow rate begins to
drop. If a vacuum suction gauge has been in­
stalled, monitor and record the readings regularly
to detect strainer blockage.

Never introduce air or steam pressure into the
pump casing or piping to remove a blockage. This
could result in personal injury or damage to the
equipment. If backflushing is absolutely neces­
sary, liquid pressure must be limited to 50% of the
maximum permissible operating pressure shown
on the pump performance curve.

Pump Vacuum Check

With the pump inoperative, install a vacuum gauge
in the system, using pipe dope on the threads.
Block the suction line and start the pump. At oper­
ating speed the pump should pull a vacuum of 20
inches (508,0 mm) or more of mercury. If it does
not, check for air leaks in the seal, gasket, or dis­
charge valve.

Open the suction line, and read the vacuum gauge
with the pump primed and at operation speed.
Shut off the pump. The vacuum gauge reading will
immediately drop proportionate to static suction
lift, and should then stabilize. If the vacuum reading
falls off rapidly after stabilization, an air leak exists.
Before checking for the source of the leak, check
the point of installation of the vacuum gauge.

STOPPING

Never halt the flow of liquid suddenly. If the liquid
being pumped is stopped abruptly, damaging

shock waves can be transmitted to the pump and
piping system. Close all connecting valves slowly.

If the application involves a high discharge
head, gradually close the discharge
throttling valve before stopping the pump.

After stopping the pump, lock out or disconnect
the power source to ensure that the pump will re­
main inoperative.

Do not operate the pump against a
closed discharge throttling valve for
long periods of time. If operated against
a closed discharge throttling valve,
pump components will deteriorate, and
the liquid could come to a boil, build
pressure, and cause the pump casing to
rupture or explode.

Cold Weather Preservation

In below freezing conditions, drain the pump to
prevent damage from freezing. Also, clean out any
solids by flushing with a hose. Operate the pump
for approximately one minute; this will remove any
remaining liquid that could freeze the pump rotat­
ing parts. If the pump will be idle for more than a
few hours, or if it has been pumping liquids con­
taining a large amount of solids, drain the pump,
and flush it thoroughly with clean water. To prevent
large solids from clogging the drain port and pre­
venting the pump from completely draining, insert
a rod or stiff wire in the drain port, and agitate the
liquid during the draining process. Clean out any
remaining solids by flushing with a hose.

BEARING TEMPERATURE CHECK

Bearings normally run at higher than ambient tem­
peratures because of heat generated by friction.
Temperatures up to 160

_F (71_C) are considered

normal for bearings, and they can operate safely to
at least 180

_F (82_C).