Installation - section b – Gorman-Rupp Pumps SE1 1/2A3 115V 1P 1483930 and up User Manual

Page 8

Advertising
background image

OM−06488

SE SERIES

PAGE B − 1

INSTALLATION

INSTALLATION − SECTION B

GENERAL INFORMATION

Review all SAFETY information in Section A.

Since pump installations are seldom identical, this
section is intended only to summarize general rec-
ommendations and practices required to inspect,
position, and arrange the pump and piping. If there
are any questions concerning your specific instal-
lation, contact your Gorman-Rupp distributor or
the Gorman-Rupp Company.

Nuts, bolts and screws used on this pump

are metric and do not match standard SAE
measurement threads. If any threaded
hardware is replaced, it must be replaced
with metric type. Attempting to force in a
fastener with SAE threads will damage the
mating threads. An optional discharge
adaptor is available to convert the metric
pipe threads in the discharge flange to the
SAE threads.

Pump Dimensions

See Figure B−1

for the approximate physical di-

mensions of this pump.

OUTLINE DRAWING

Figure B−1. Pump Model SE1 1/2A3 115V 1P

PREINSTALLATION INSPECTION

The pump assembly was inspected and tested be-
fore shipment from the factory. Before installation,
check for damage which may have occurred dur-
ing shipment. Check as follows:

a. Inspect the pump assembly for cracks, dents,

damaged threads, and other obvious dam-
age.

b. Check for and tighten loose attaching hard-

ware. Since gaskets tend to shrink after dry-

Advertising