Elmo Rietschle V-VTE 3/6/8/10 User Manual

Page 14

Advertising
background image

14

|

www.gd-elmorietschle.com © Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH

Installation

5 Installation

5.1

Preparing for installation

Check the following points:

Machine freely accessible from all sides

Do not close ventilation grids and holes

Suffi cient room for installing and removing pipes
and for maintenance work, particularly for install-
ing and dismantling the machine

No external vibration effect

Do not suck any hot exhaust air from other ma-
chines into the cooling system.

There must be a minimum space of 20 cm in front of the housing cover (

Fig. 1/

b) for servicing.

The cooling air entries (

Fig. 1/

E) and the cooling air exits (

Fig. 1/

F) must have a minimum distance

of 8 cm from any obstruction. The discharged cooling air must not be recirculated.

5.2

Installation

NOTICE

The machine may only be operated when it is
set up horizontally.
Other installation on request.

Material damage resulting from the machine
tipping over and falling.

When installed at more than 1000 m above sea
level a reduction in power is noticeable. In this
case we would ask you to contact us.

Ensure that the foundation complies with the follow-
ing conditions:

Level and straight

The bearing surface must be able to bear the
weight of the machine

It must be possible to install the machine on a fi rm foundation without anchoring. When installing
on a substructure we recommend fi xing with fl exible buffers.

Advertising