Precast pads, 2 precast pads, 0 site preparation, continued – Alpha Technologies Radium MiniBay User Manual
Page 40: Front of pad sweep opening, Front of pad

40
044-001-C0-00, Rev. C
Fig. 4-2, Precast Pad Dimensions for Single Enclosure
(P/N 641-110-10)
4.0
Site Preparation, continued
4.2 Precast Pads
The type of enclosure mounting pad is determined by the size of the enclosure (single bay,
single bay with side chamber, dual bay, dual bay with single side chamber, and dual bay
with dual side chambers). Typically, Alpha Technologies recommends using precast polymer
mounting pads. These pads are designed for proper cabinet support and ease of installation.
Drilling areas for openings are indicated for coax and service sweeps, and pre-installed
threaded inserts for enclosure attachment.
RAD-MB
44" SYMM.
4-1/2"
10-/4"
8-1/2"
2-1/4"
5-1/2"
-5/8"
4-5/8"
2" SYMM.
27-/4" SYMM.
42
" SY
M
M
.
0
" SY
M
M
.
25
-7
/8
" SY
M
M
.
24
" SY
M
M
.
Front of Pad
Sweep Opening
3" MIN.
Front of Pad