9 maintenance, Aintenance, 9maintenance – Alpha Technologies Cordex 48-1kW 19 6000W Installation User Manual

Page 32

Advertising
background image

030-706-B2 Rev B

Page 24 of 26

9

Maintenance

Although very little maintenance is required with Apha systems, routine checks and adjustments are
recommended to ensure optimum system performance. Qualified service personnel should do repairs.

The following table lists a few maintenance procedures for this system. These procedures should be performed at
least once a year.

WARNING: HIGH VOLTAGE AND SHOCK HAZARD.

Use extreme care when working inside the shelf while the system is energized.
Do not make contact with live components or parts.

Circuit cards, including RAM chips, can be damaged by static electricity. Always wear a grounded
wrist strap when handling or installing circuit cards.

Procedure

Date Completed

Clean ventilation openings

Inspect all system connections (re-torque as necessary)

Verify alarm/control settings

Verify alarm relay operation

Table G–Sample maintenance log






NOTE: There are no field replaceable parts.

Advertising