Alpha Technologies Underground Battery Vault User Manual

Page 10

Advertising
background image

031-040-B0-002 Rev. B

10

To install two 48 VDC battery strings in the UBV, load them in this order (observe indicated orientation with
respect to battery polarity):

1.

Install batteries in the corners.

2.

Install either of these pairs of batteries next.

3.

Install this pair last.

+

-

+

-

+

-

+

-

+

-

+

-

+

-

+

-

1

1

2

3

2

2. INSTALLATION

2.2 Battery

Placement

Advertising