J&M 500ST User Manual

Page 17

Advertising
background image

17

2.0 Service

2.1 Grease Conveyer Bearings

Grease the conveyor bearings every 10 hours of operation and before storage. Use only two pumps of grease per

bearing (Figure 2.1).

NOTE: Over lubrication of these bearings will result in premature failure.

NOTE: The conveyor has four bearings that need grease (two at each end).

2.2 Grease Boom Arm

Grease pivot points on boom arm every 50 hours and before storage (Figure 2.2).

Figure 2.1

Grease Point

Grease Points

Figure 2.2

Advertising