Set-up instructions – J&M TF215 User Manual

Page 11

Advertising
background image

Pg. 11

SET-UP INSTRUCTIONS

Step 4 – Installing the Base Unit Baskets
Secure the torsion-flex arm of the rolling basket
assembly to the rear tubing member of the Base
Unit Main Frame using two 5/8” x 4” x 5 1/2" U-
Bolts and 5/8” Lock Nuts.

Make sure the baskets are symmetrically
placed on the Base Unit Main Frame and
have a 1 1/2” clearance between baskets.

Note: Be sure the basket assemblies with the 3”
x 3” torsion arms are secured to the Base Unit
Main Frame. The rolling basket assemblies for
the side wings have a smaller 2 1/2” x 2 1/2”
torsion arm.

Step 5 – Installing the Jack Stand
Slide the Storage Extension Arm into the square
tubing on the Base Unit Main Frame as shown
and secure using one 1/2" x 4 1/2" Grade 5 Bolt
and 1/2" Lock Nut. Pin the Jack Stand
Assembly to parking position on the extension
arm and lower the jack so the weight of the base
unit is transferred to the jack. Using two 1/4” x
1” Grade 5 Bolts, mount the SMV emblem to the
extension arm as shown. (Note: For soil
conditioners with side wings that are 5’ long or
smaller. If equipped with side wings longer than
5’, secure the SMV emblem to the right Wing
Arm Rest.

Step 6 – Installing the Wings
Align and connect the hinges on the side Wing
Frame to the matching hinge assembly on the
Main Unit Base Frame using two 1 3/4" x 5 1/4"
Grade 5 Bolt with 1 3/4” Lock Nut.

Connect the Pivot Linkage Arm on the base
main frame to the center tab on the folding wing
frame using one 1 3/4" x 4 3/4” Grade 5 Bolts,
one 1 3/4” Washer and one 7/16” x 2 3/4” Roll
Pin.

5/8” x 4” x 5 1/2” U-Bolts

Rolling Baskets with
3” x 3” Torsion Arm

SMV Emblem

Jack Stand

Storage Extension Arm

Wing Frame

Align and Secure Corresponding Hinge
Components

Advertising
This manual is related to the following products: