Loading the rack – CHIEF NW2 Series User Manual

Page 10

Advertising
background image

NW2F8-12

Installation Instructions

10

Completing Installation

1.

Hang rack over top rail of mounting plate. (See Figure 13)

2.

Fasten rack from below to mounting plate using two
10-32 x 1/2" security buttonhead screws (K). (See
Figure 13)

Figure 12

Figure 13

DANGER:

IMPROPER WIRING CAN LEAD TO DEATH

OR SEVERE PERSONAL INJURY! Grounding must be
installed by qualified personnel using a UL Recognized No.
12AWG Green and Yellow grounding wire connected to
grounding lug on rack.

LOADING THE RACK

NOTE:

The alignment panels shipped with the racks are

optional. They may be removed to facilitate loading of
the racks.

Load Distribution

CAUTION:

BEGIN PLACEMENT OF LOAD AT BOTTOM

OF RACK! Load rack, moving from bottom toward top of rack.
Loading rack incorrectly may result in instability causing
possibly injury and/or damage to components.

1.

Begin placement of components into the rack at the lowest
point.

(back view)

(K) x 2

(inside view of door)

Grounding screw and nut
installed at factory

affixed adjacent to grounding terminal.

Earthing symbol IEC 60417 No. 5019

Location of
grounding
lugs

Location of
grounding
lugs

(front view of rack)

Advertising