CHIEF NW2 Series User Manual

Page 8

Advertising
background image

NW2F8-12

Installation Instructions

8

3.

Hold metal channel on anchor (J) flat alongside plastic
straps and slide channel through hole. (See Figure 5)

Figure 5

4.

Holding plastic straps on anchor (J), pull anchor away from
wall until channel rests flush behind wall making sure anchor
channel is positioned vertically on stud. (See Figure 6)

5.

Slide plastic cap on anchor (J) towards wall until flange of
cap is flush with wall. (See Figure 6)

Figure 6

6.

Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 7)

7.

Repeat Steps 3 through 6 for other mounting hole.

Figure 7

8.

Place mounting plate (C) over anchors and align top
mounting holes in mounting plate with holes in anchors.

9.

Insert 1/4-20 x 1-3/4" Phillips pan head screws (G) through
1/4" washer (H), corresponding mounting hole on mounting
plate and into anchor (J) and tighten until flush against
mounting plate. DO NOT overtighten! (See Figure 8)

WARNING:

IMPROPER INSTALLATION CAN LEAD TO

EQUIPMENT FALLING CAUSING SERIOUS PERSONAL
INJURY OR DAMAGE TO EQUIPMENT! Overtightening of
mounting hardware can damage the steel studs. DO NOT
overtighten mounting hardware!

Figure 8

10. Repeat Step 9 for remaining upper mounting hole.

11. Repeat Steps 1-9 for lower mounting holes.

(J) x 4

Drywall

Plastic straps

3

(J) x 4

Plastic cap

Drywall

Anchor metal channel

5

Steel stud

(side view)

4

4

Plastic straps

Drywall

Anchor metal channel

Plastic cap

6

Steel stud

(side view)

Drywall

Anchor metal channel

(C)

(G) x 4

9

Steel stud

(H) x 4

(side view)

Advertising