Filling the system, 3 filling the system – DE DIETRICH VIVADENS MCR-P 24, MCR-P .._.. MI User Manual

Page 21

Advertising
background image

4

Clean the outside of the boiler using a damp cloth and a light

detergent.

CAUTION

Only a qualified professional is authorised to clean the

inside of the boiler.

5.3

Filling the system

The water pressure in the boiler must be between 1,5 and 2 bar. Add

water to the installation if necessary. To do this, proceed as follows:
1. Open the valves on all radiators connected to the heating system.

2. Set the room thermostat to as low a temperature as possible.

3. Switch off the boiler electrical power supply.

1

2

3

4

T000181-B

T000182-A

T000155-A

MCR-P 24 MCR-P 24/28 MI MCR-P 30/35 MI MCR-P 34/39 MI

5. Checking and maintenance

070513 - 127684-01

20

Advertising