Draining the installation, 5 draining the installation – DE DIETRICH VIVADENS MCR-P 24, MCR-P .._.. MI User Manual

Page 24

Advertising
background image

8. Wait until water comes out of the bleed valve and then close the

bleed connection.

CAUTION

The water may still be hot.

9. After venting, check whether the pressure in the installation is still

sufficient. Add water to the installation if necessary.

10.Switch on the boiler. A vent cycle of a duration of around 3 minutes

is carried out automatically.

11.Set the room thermostat or the regulator.

5.5

Draining the installation

It may become necessary to empty the water from the heating system

when the radiators have to be replaced, should there be a major water

leak or a risk of frost. To do this, proceed as follows:
1. Open the valves on all radiators connected to the heating system.

2. Switch off the boiler electrical power supply.

T000218-A

T000228-A

1,5 ... 2 bar

T000183-A

1

2

3

4

T000181-B

5. Checking and maintenance

MCR-P 24 MCR-P 24/28 MI MCR-P 30/35 MI MCR-P 34/39 MI

23

070513 - 127684-01

Advertising