Operating the appliance, Putting the appliance into operation, Commissioning – DE DIETRICH TWH 200E - TWH 300E - TWH 300EH User Manual

Page 15: Reading out measured values, Measurements menu, 4 operating the appliance, 1 putting the appliance into operation, 2 reading out measured values

Advertising
background image

4 Operating the appliance

4.1

Putting the appliance into operation

4.1.1.

Commissioning

CAUTION

Initial commissioning must be done by a qualified

professional.

Carry out the commissioning operations in the following order:
1. Connect to the mains.
2. Check that no error codes or messages are shown on the display.

The domestic hot water set point temperature is set to 55°C in

comfort mode.

3. Select the Boost operating mode.

¼See chapter: "Choosing the operating mode", page 16

4. The compressor starts up after 120 seconds if DHW production is

required.

4.2

Reading out measured values

4.2.1.

Measurements menu

1. Press once the MENU key. The SE nS 1 menu is displayed.
2. Press the MODEB key to go to the Measurements menu. The SE

01

menu is displayed.

3. Use the ( and ) keys to switch from one measurement to

another.

Parameters Description

Unit

SE 01

Top DHW temperature sensor

°C

SE 02

Middle DHW temperature sensor

°C

SE 03

Bottom DHW temperature sensor

°C

SE 04

Room sensor

°C

SE 05

Evaporator temperature sensor

°C

SE 06

Electricity tariff:

4

HP1: Peak hours

4

HC0: Off-peak hours

C003206-D

1x
2x
3x

.

.

.

1

4

3

4

1

2

MENU

MODE

TWH 200E TWH 300E TWH 300EH

4. Operating the appliance

03/02/2014 - 7605313-001-02

14

Advertising