Intended methods of connection, Three phase wiring instruction, Three – BJM Pumps PGV220-575T User Manual

Page 9: Phase, Wiring, Instruction

Advertising
background image

9

INTENDED METHODS OF CONNECTION

BJM Pumps has been evaluated for use with water or water based solutions. Please

contact the manufacturer for additional information.

THREE PHASE WIRING INSTRUCTION

FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP

FROM ITS POWER SOURCE BEFORE HANDLING.

“Risk of electrical shock” Do not remove power supply cord and

strain relief or connect conduit directly to the pump.

Installation and checking of electrical circuits and hardware should

be performed by a qualified licensed electrician.

To automatically operate a non-automatic three phase pump, a control panel is

required.

F

ollow the instructions provided with the panel to wire the system for automatic

three phase pumps see automatic three phase wiring diagram.

Before installing a pump, check the pump rotation to insure that wiring has been

connected properly to power source, and that the green lead of power cord (See wiring

diagram), is connected to a valid ground, momentarily energize the pump, observing the

directions of kick back due to starting torque. Rotation is correct if kick back is in the

opposite direction of rotation arrow on the pump casing. If rotation is not correct,

switching of any two power leads other than ground will provide the proper rotation.

Advertising