N O T I C E

To prevent backpressure and damage to the analyzer, make sure that the
analyzer is higher than the facility drain(s) used and that the drain line has a
constant downward slope.

N O T I C E

The pressure regulator is set to a fixed pressure and cannot be changed.

Use the supplied tubing (6 mm), Y-strainer with filter and pressure
regulator to plumb the drain and the sample to the analyzer. Refer to

Figure 5

. The sample line tubing that goes into the plumbing access

ports must be 6 mm. Tubing of 1/4 in. may be used for the sample line
up to the valve/y-strainer but not into the plumbing access ports of the
analyzer.

Figure 5 Sample and drain lines

1 Sample in (single-

stream)

4 Non-adjustable

pressure regulator
(set at 4 psi to protect
analyzer)

7 Case drain

2 Shut-off valve

5 Sample bypass drain

3 Y-strainer with filter

6 Chemical drain

Sample line guidelines

Select a good, representative sampling point for the best instrument
performance. The sample must be representative of the entire system.
To prevent erratic readings: