Start-up and operation – King Technology POOL FROG Model 6100 User Manual

Page 5

Advertising
background image

5

PO

OL

FRO

G B

AC

PAC

Start-up and Operation

1.

2.

3.

4.

5.

Add a stabilizer or conditioner to the
pool at the beginning of the season
if the stabilizer level is below 20
ppm. This will prevent chlorine burn
off. Follow manufacturer’s directions
carefully.

Shock the pool with chlorine to rid
the water of all contaminants before
beginning with POOL FROG®. Follow
manufacturer’s directions carefully.

THIS STEP IS VERY IMPORTANT TO
START-UP.
USE CHLORINE SHOCK ONLY.

Install a POOL FROG® Mineral
Reservoir into the POOL FROG®
Cycler. (Follow directions on page 7.)

REPLACE THE POOL FROG®
MINERAL RESERVOIR EVERY
6 MONTHS OR AFTER ONE POOL
SEASON WHICHEVER IS SHORTER.

Replace cap and run POOL
FROG® Cycler, with POOL
FROG® Mineral Reservoir
inserted, for 10 minutes on
Setting 5.

For an Algae Protection
Guarantee insert FROG BAM®
into POOL FROG® Mineral
Reservoir in POOL FROG®
Cycler. (Follow directions on
page 8.)

When chlorine reading is down
to 1.0 ppm, which may take a
few days, insert POOL FROG®
Bac Pac. (Follow directions on
page 9.)

WARNING

Do not add shock in or near the skimmer or into the
POOL FROG® Cycler as it could damage equipment,
risk potential explosion or discolor your pool surface.

6.

Advertising