14

PVC

CEMENT

PVC

CEMENT

Water

CYCLER

MeteredPoo

l Purifier

In-line Installation - 5400 Model

Do NOT install in copper pipe if using
POOL FROG® Bac Pac as chemical
corrosion occurs.

Leave 12” to
15” above
and around
POOL FROG®
Cycler to allow
room for easy
replacement
of POOL
FROG® Mineral
Reservoir and
POOL FROG®
Bac Pac.

Do NOT install
this POOL
FROG® Cycler
off-line.

Bi-flow valve design allows water flow
in either direction.

Measure the distance between
POOL FROG® Cycler male
adapters and cut out a section
of pipe 3” less than that
dimension.

Following Primer directions, brush Primer on the inside of the
male adapters and to ends of pipe. Repeat this process with
PVC cement following directions on that product.

Insert PVC pipe into male
adapters with a twisting
action. Hold in place 5 to 10
seconds to bond.

If using a POOL FROG® Bac Pac, isolating the POOL FROG®
Cycler by installing a corrosion resistant check valve is
recommended.

Use Phillips pan head
screws through the
mounting holes at the
POOL FROG® Cycler
base to secure the
POOL FROG® Cycler into
a treated wood base.

#10 x 1 1/4”
Phillips Pan
Head Screws
with Washers

RECOMMENDED

Corrosion Resistant
Check Valve

MATERIALS NEEDED

Primer and PVC Cement

TOOLS NEEDED

Pipe Wrench

Hacksaw

Tape Measure

1.

2.

3.

4.

12" to 15"

12" to 15"

OR

Install after all equipment

and as far as possible from
heater.

Any additional sanitizing

equipment that is installed
with FROG® must be installed
after FROG® (never before)
on the return line to the pool.