SWG Swing Gate Operator Installation Guide

- 3 -

P1227 Revision X5 2-13-2013

Mounting Pad Installation

The gate operator mounts bolted to posts secured in
concrete footings. The posts support the operator and
prevent it from moving during operation.

Gate Preparation

Before installing the gate operator, make sure the gate’s
swing is free and level throughout the entire swing path. If
the gate does not seem to operate properly, it may affect
the operator performance or greatly shorten the life of the
unit. The gate should be designed so that airfl ow is ample to
prevent wind resistance and drag.

Mounting Specifi cations

Use two 3 - 3-1/2” OD galvanized posts and secure with
concrete footings as shown, length to be determined by
local codes, frost line depth and soil conditions.

Attach the operator with the U-bolts, side plates and hardware
provided. Four 3/16” side plates go on the outside top and
bottom, two 3/16” side plates go on the inside top, and two
1/2” side plates go on the inside bottom (see the illustration
at right). The operator should be positioned at a level to
allow the arm to be installed at mid-height on the gate. “H”
dimension can vary depending on gate construction. Make
sure the posts do not protrude above the operator cabinet.

NOTE: Maximum gate opening angle is approximately 95 degrees,

depending on gate width. If larger opening angle is required,
non-standard positioning of the operator and modifi ed articulating
arms may be required. Contact the factory for technical information,
pricing, and availability.

Figure 2. Mounting Pad Specifi cations

WARNING

The operator is intended for installation only on gates used for
vehicles. Pedestrians must be supplied with a separate access
opening. The pedestrian access opening shall be designed to
promote pedestrian usage. Locate the gate such that persons
will not come into contact with the vehicular gate during the
entire path of travel of the vehicular gate.

WARNING

The gate must be installed in a location so that enough
clearance is supplied between the gate and adjacent structures
when opening and closing to reduce the risk of entrapment.
Swing gates shall not open into public areas.

OPERATOR ACCESS DOOR

MUST FACE AWAY FROM

DRIVEWAY

23” SPACE REQUIRED BEHIND OPERATOR

FOR ARM CLEARANCE WHILE OPENING

IF NON-STANDARD MOUNTING IS

NECESSARY, CONSULT THE FACTORY

Figure 1. Side Plate Installation