Mallory Ignition ACCEL 3 stage rev_limiter 49345 User Manual

Page 12

Advertising
background image

An RPM-Activated switch that turns on an external A

CCEL

S

HIFT

L

IGHT

.

Press the S

HIFT

L

IGHT

button. Adjust the setting with the

⇓

or

⇑

buttons.

The Red

&

White wire provides +12

VDC

.

The Black

&

Pink wire is switched to Ground.

Another RPM-Activated switch. This one actuates an external solenoid
normally used to add Nitrous Oxide into the Air/Fuel mixture.
Press the N

2

O button. Adjust the setting with the

⇓

or

⇑

buttons.

The Pink wire provides +12

VDC

, Brown wire is switched to Ground.

Selects the B

URN

RPM Rev-limit.

Is activated by a switch (Dark Green

&

White wire) on the dashboard.

Press the B

URN

RPM

button. Adjust the setting with the

⇓

or

⇑

buttons.

Selects the S

TAGE

RPM. It is activated by switch (Dark Blue

&

White

wire) on the shifter, which typically activates the Line Lock or Trans
Brake solenoid. Rev the engine up to S

TAGE

RPM. When the switch

is released the engine is free to rev up to P

EAK

RPM.

Press the S

TAGE

RPM button. Adjust the setting with the

⇓

or

⇑

buttons

Sets the maximum RPM that you will allow your engine to reach.
Press the Peak RPM button. Adjust the setting with the

⇓

or

⇑

buttons

(This setting will not override the rev-limit set inside your A

CCEL

ignition box!)

.

I

NSTALLATION

C

HECKLIST

Disconnect the battery’s negative (ground) connections.

Disconnect any N

2

O connections.

Install the your A

CCEL

ignition module and set its

DIP

-

S

witches. (Pg. 4)

Set the A

CCEL

ignition module’s

DIP

-

S

witch-4 up!

Either set the ignition module’s rev-limit higher than the Peak RPM you will
program into the 3-Stage Rev-limiter or disable the ignition module’s rev-limit.

Install and connect the flat, 4-pin connector. (Pgs. 8, 9,

&

Wiring Diagram)

B

URN

RPM

switch

S

TAGE

RPM

switch.

Connect the trigger input (square male connector). (Pg. 9)

Connect an A

CCEL

Shift Light (one of the 2-pin male connectors). (Pg. 8)

Reconnect the battery.

Set the proper number of cylinders. (Pg. 5)

Program reasonable values for B

URN

RPM, S

TAGE

RPM

and P

EAK

RPM

. (Pg. 5)

Program reasonable values for RPM related activities: N

2

O, Shift Light.

Save these initial values into memory with the SAVE button. (Pg. 5)

Adjust and verify engine timing

N

2

O activation verified with Shift Light, then connected to its solenoid.

Fine tune any values that need adjustment and save the new values.

Advertising