Mallory Ignition ACCEL 3 stage rev_limiter 49345 User Manual

Page 12

Advertising
background image

An RPM-Activated switch that turns on an external A

CCEL

S

HIFT

L

IGHT

.

Press the S

HIFT

L

IGHT

button. Adjust the setting with the

or

buttons.

The Red

&

White wire provides +12

VDC

.

The Black

&

Pink wire is switched to Ground.

Another RPM-Activated switch. This one actuates an external solenoid
normally used to add Nitrous Oxide into the Air/Fuel mixture.
Press the N

2

O button. Adjust the setting with the

or

buttons.

The Pink wire provides +12

VDC

, Brown wire is switched to Ground.

Selects the B

URN

RPM Rev-limit.

Is activated by a switch (Dark Green

&

White wire) on the dashboard.

Press the B

URN

RPM

button. Adjust the setting with the

or

buttons.

Selects the S

TAGE

RPM. It is activated by switch (Dark Blue

&

White

wire) on the shifter, which typically activates the Line Lock or Trans
Brake solenoid. Rev the engine up to S

TAGE

RPM. When the switch

is released the engine is free to rev up to P

EAK

RPM.

Press the S

TAGE

RPM button. Adjust the setting with the

or

buttons

Sets the maximum RPM that you will allow your engine to reach.
Press the Peak RPM button. Adjust the setting with the

or

buttons

(This setting will not override the rev-limit set inside your A

CCEL

ignition box!)

.

I

NSTALLATION

C

HECKLIST

Disconnect the battery’s negative (ground) connections.

Disconnect any N

2

O connections.

Install the your A

CCEL

ignition module and set its

DIP

-

S

witches. (Pg. 4)

Set the A

CCEL

ignition module’s

DIP

-

S

witch-4 up!

Either set the ignition module’s rev-limit higher than the Peak RPM you will
program into the 3-Stage Rev-limiter or disable the ignition module’s rev-limit.

Install and connect the flat, 4-pin connector. (Pgs. 8, 9,

&

Wiring Diagram)

B

URN

RPM

switch

S

TAGE

RPM

switch.

Connect the trigger input (square male connector). (Pg. 9)

Connect an A

CCEL

Shift Light (one of the 2-pin male connectors). (Pg. 8)

Reconnect the battery.

Set the proper number of cylinders. (Pg. 5)

Program reasonable values for B

URN

RPM, S

TAGE

RPM

and P

EAK

RPM

. (Pg. 5)

Program reasonable values for RPM related activities: N

2

O, Shift Light.

Save these initial values into memory with the SAVE button. (Pg. 5)

Adjust and verify engine timing

N

2

O activation verified with Shift Light, then connected to its solenoid.

Fine tune any values that need adjustment and save the new values.

Advertising