INSTALLATION

Prepare Pit

Before lowering the dock leveler into the pit, the

following must be performed:

1. Remove all debris from the pit and sweep the pit

clean.

2. Check the entire dock leveler pit for proper

construction according to approved/certified pit

drawings. Make sure pit is square by making the

following measurements:

• Measure pit width distance (A) at both front

and rear of pit.

• Measure dock floor-to-pit floor distance (B) at

all four corners.

• Measure pit length distance (C) at both sides.

• Measure corner-to-corner (criss-cross) distance

(D) at both sides. Take measurements at dock

floor level and at pit floor level.

If any measurement is off by more than 1/8 in.

(3.18 mm), contact Poweramp Technical Services

before proceeding.

3. Make sure the field junction box for the dock

leveler (E) is at the correct location per pit

diagrams.

A—Distance (Pit Width)

(Front and Rear)

B— Distance (Dock Floor-to-Pit

Floor) (All Four Corners)

C— Distance (Pit Length)

(Both Sides of Pit)

D— Distance (Pit Corner-to-Corner) (Top,

Bottom, and Both Sides)

B

D

C

A

IMPORTANT

DO NOT remove the shipping bands around the

dock leveler lip until instructed to do so.

Post safety warnings and barricade the work

area at dock level and ground level to prevent

unauthorized use of the dock leveler before

installation has been completed.

Failure to follow the installation instructions can

result in damage to dock leveler, the facilities, and/

or serious personal injury or death.

Only trained installation professionals with the

proper equipment should install this product.