Operation, Operating instructions—continued – Poweramp VH SERIES HYDRAULIC 10.2011 User Manual

Page 23

Advertising
background image

21

4111-0002 — Sept 2010

OPERATION

NOTE: If end unloading is required, see End

Loading/Unloading Instructions on page 22.

For ramp loading or unloading, the VH

dock leveler can be operated by using the

RAISE button on the control panel.

1. Check to make sure truck/trailer is positioned

squarely against dock bumpers.

2. Instruct driver to remain at the dock until the

loading or unloading process has been completed.

3. Chock the truck/trailer wheels or use the truck

restraint if available.

Ramp Loading/Unloading Instructions

4. Extend the platform lip onto truck/trailer as follows:

a. Raise the platform by pushing and holding

RAISE button (A).

b. Hold the RAISE button until the lip is fully

extended, then release the RAISE button. The

platform will lower until the lip is resting on the

truck/trailer bed.

c. Make sure that the lip is fully extended and

supported on the truck/trailer along the entire

width of the platform with at least 4 in. (102 mm)

of lip contacting the truck bed.

7. When loading or unloading is finished, raise the

platform by pushing and holding RAISE button

(A).

Hold the RAISE button until the lip folds enough

to clear the truck/trailer bed, then release the

RAISE button. The lip will fold and the platform

will return to the cross-traffic position.

8. Remove chocks from truck/trailer wheels or

release the truck restraint if used.

9. Indicate to driver that truck may leave the dock.

A—RAISE Button

A—RAISE Button

B—ARTD Switch

5. Proceed with loading or unloading the truck/trailer.

6. If end loading is necessary, see End Loading/

Unloading Instructions on page 22.

Operating Instructions—Continued

A

A

B

Advertising