Installation, Important, Prepare dock leveler – Poweramp AP SERIES AIR POWERED 4.2009 User Manual

Page 11

Advertising
background image

9

4111-0009 — Oct 2007
Jan 2009

INSTALLATION

1. Remove any control panel and bumpers that may

be banded to the frame of the dock leveler.
DO NOT remove the shipping bands (B) around
the platform lip and leveler frame at this time.

Poweramp dock levelers are designed with
installation in mind. Each unit is shipped with lifting
brackets (A) fastened to the platform side joists.

Prepare Dock Leveler

NOTE: Overall width of platform and lifting brackets

(A) must be kept to a minimum to prevent
interference between the lifting brackets and
the pit walls as the dock leveler is lowered
into the pit.

2. Make sure the mounting hardware of lifting

brackets (A) is snug. The brackets should pivot
relatively freely on the mounting cap screw. DO
NOT over tighten.

3. Attach lifting chains to lifting brackets (A) and to a

lifting device (i.e., hoist or fork truck) having the
appropriate lifting capacity and reach.

4. Remove wood blocks that are attached to the

leveler frame before putting the dock leveler into
the pit.

5. Attach a temporary, switched, power supply to the

blower before lowing leveler into pit. Keep power
cables clear of frame members, shim locations
and pinch points. DO NOT CONNECT POWER
AT THIS TIME.

6. Remove 3 plastic ties that hold the bag and bag

support skid to the underside of the leveler during
shipping before lowering leveler into pit.

A— Lifting Bracket (2 used)

B — Shipping Bands

Remove 3 plastic ties, 2 Rear, 1 Front before lowing into pit

IMPORTANT

DO NOT over tighten the lifting bracket hardware.

Over tightening can damage the weather seal, if
equipped.

The dock leveler is heavy. Use a lifting device and
chains with the appropriate lifting capacity and
reach.

Always use the lifting brackets provided with the
unit whenever lowering or lifting a dock leveler into
or out of a pit.

Failure to follow these instructions may result in
damage to dock leveler and/or serious personal
injury or death.

IMPORTANT

DO NOT remove the shipping bands (B) around
the platform lip and leveler frame at this time. The
shipping bands are needed to hold the leveler
together during the installation process.

A

B