Installation, Important – Poweramp CM SERIES MECHANICAL 12.2006 User Manual

Page 13

Advertising
background image

INSTALLATION

11

4111-0006 — July 2006

1. Remove any bumpers that may be banded, or

bolted to the frame of the dock leveler.

DO NOT remove the shipping bands (B) around
the platform lip and leveler frame at this time.

NOTE: Overall width of platform and lifting brackets

(A) must be kept to a minimum to prevent
interference between the lifting brackets and
the pit walls as the dock leveler is lowered
into the pit.

2. Make sure the mounting hardware of lifting

brackets (A) is snug. The brackets should pivot
relatively freely on the mounting cap screw. DO
NOT over-tighten.

3. Attach lifting chains to lifting brackets (A) and to a

lifting device (i.e., hoist or fork truck) having the
appropriate lifting capacity and reach.

4. Remove wood blocks that are attached to the

leveler frame before putting the dock leveler into
the pit.

IMPORTANT

IMPORTANT

DO NOT over-tighten the lifting bracket hardware.

Over-tightening can damage the weather seal, if
equipped.

Advertising