Teledyne 2010A - Split architecture thermal conductivity analyzer User Manual

Page 94

Advertising
background image

2 Installation

Model 2010A

2-8: Part II

Teledyne Analytical Instruments

the system is ready to test. Before plugging either of the units into their
respective power sources:

•

Check the integrity and accuracy of the gas connections. Make
sure there are no leaks.

•

Check the integrity and accuracy of the electrical connections.
Make sure there are no exposed conductors

•

Check that sample pressure is between 3 and 40 psig, according
to the requirements of your process.

Power up the system, and test it as follows:

1. Repeat the Self-Diagnostic Test as described in Part I, chapter 4,

section 4.3.5.

Advertising