Teledyne 6700-C Total Organic Carbon Analyzer (Hi-Temp Combustion version) User Manual
Page 25

High Temperature Combustion
Installation/Startup
Teledyne
Analytical
Instruments
25
3.4 Inserting Reactor into Furnace
Carefully insert the Reactor Assembly into the Furnace and secure
the Assembly by following the procedure outlined in Figures 3-5
through 3-8.
Finger-tighten the Gas/Liquid Separator (P/N: G608) to Reactor,
as shown below in Figure 3-5.
Figure 3-5: Gas/Liquid Separator
Connect the Combustion Module Drain port to a facility gravity
drain with a 1 inch air break between the end of the drain line
and any liquids in the collection vessel (jar, facility drain) in
order to prevent a “vapor lock”. This drain line should be routed
in a straight fashion and free of kinks or restrictions thereby
allowing the liquids to drain freely.
Prepare the Gas/Liquid Separator by filling it with D.I. water
until it overflows to drain, as shown in Figure 3-6. This provides
proper sealing of the reacted sample gases.