Installation – Teledyne LGA-3500 - Laser Gas Analysis system User Manual
Page 25

Laser Gas Analyzer
Installation
Teledyne
Analytical
Instruments
11
Installation
Installation of the Model 3500 includes:
•
Unpacking
•
Mounting
•
Flange connections
•
Installing transmitter and receiver
•
Electrical connections
•
Optical transmission adjustments and fine tuning
3.1 Unpacking the Instrument
The unit is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the analyzer and inspect
it for damage. Immediately report any damage to the shipping agent.
3.2 Installation Preparation
It is very important to prepare thoroughly before installing the
system. This includes having all the tools needed handy, choosing a
proper installation location, and correct welding of the flanges to the gas
flow pipe well. See section 3.3.1. Figure 3-1 shows the general layout of
the Model 3500 Laser Gas Analyzer.
3.2.1 Installation and Adjustment Tools
The following tools will be required for proper installation:
Wrenches
M5 wrench—used to tighten the M5 bolts
connecting the instrument flange and
transmitter/receiver.
Two 12” adjustable wrenches—used to tighten
EMC and nut connector.