2

Leveling

Cabinets must be leveled when installed. Failure to level your cabinet may result in doors not sealing, closing correctly,
or condensate water not draining properly.

Legs - Rotate the foot of the leg with an adjustable wrench to achieve desired height for leveling.

Casters - Cabinets with casters can be leveled by placing large flat washers in between the 1/2” stud and the

holes located on the case bottom.

Installing Shelves

All cabinets with shelves are supplied with pilasters and shelf clip supports. Shelves are easily installed by inserting the
shelf support clips into the pilasters so they fit tightly. Align the shelf so the smaller fill wires run from front to rear and
rest the shelf on the clips.

Roll-In or Roll-Thru Installation

*IMPORTANT: The floor where your new roll-in/roll-thru cabinet is to be permanently located must be a level, flat

surface prior to installation. Failure to properly level and install your equipment can void equipment

warranty!

*Notes: (a) If it is necessary to move the roll-in/roll-thru cabinet after taking off the skid, remove all doors and carefully

push the cabinet at a point of no more than 36" (inches) from the bottom to avoid damage.

(b) It is an NSF requirement that roll-in/roll-thru models are sealed to the floor upon installation.

(c) If required, the procedure for setting and grouting the two section model is illustrated within this section and

also applies to one section models. For reasons of clarity, the illustrations are shown without doors.

Step 1: Locate roll-in/roll-thru model in exact position in which it is to be set permanently.

Step 2: Level unit, inserting metal shims under unit where required. It is important that an accurate carpenters level be

used when leveling cabinet. See Figure 1 below.

Step 3: Construct a wood form to act as a retainer for the grouting compound around the entire base of the cabinet.
See

Figure 2 below. Pour the grout mixture at various intervals around the form to assure complete fill under

the

cabinet.

Step 4: Using a wide blade putty knife, taper the grout to a feather edge.


Step 5: A tube of NSF approved silicone sealer, having an applicator type nozzle, is highly suited for sealing roll-in/

roll-thru models to floor. Cut off a small portion of the applicator nozzle and apply a small uniform bead

completely around the base of the cabinet.

REACH-IN / PASS -THRU INSTALLATION INSTRUCTIONS

ROLL-IN / ROLL-THRU INSTALLATION INSTRUCTIONS

ROLL-IN / ROLL-THRU INSTALLATION INSTRUCTIONS

Figure 1

Metal Shims

Level Gauge

Figure 2

Wood Form

Advertising