Installation procedure – Direct Lift HR8000 User Manual

Page 9

Advertising
background image

TWO COLUMN 8K FLOOR PLATE LIFT

CO7589

IN50014 Rev. D 03/2/2010

9

INSTALLATION PROCEDURE

STEP 1

: After unloading the lift, place it near the intended installation location.


STEP 2

: Remove the shipping bands and packing materials from the unit. The Power Unit will

be unpacked from the top. Note: Be careful not to drop power unit.

STEP 3

: Remove the packing brackets and bolts holding the two columns together (do not

discard bolts; they are used in the assembly of the lift).

STEP 4

: Once the power unit column location is decided, insure that the proper lift placement is

observed from walls and obstacles. Also check the ceiling height for clearance in this location.
Note: the power unit column can be located on either side. It is helpful to try and locate
the power side with the passenger side of the vehicle when loaded on the lift to save
steps during operation.

STEP 5

: Install the cylinders into the carriage.

STEP 6

: Install the top plate onto the top of the columns.


STEP 7

: Position the columns facing each other 134-5/8” outside base plates. Square the

columns by measuring diagonally from corner points on base plates (within 1/4”).

M12 x 1-9/16”Bolt
& Washer

Lockwasher
& M12Nut