Installation, continued, Platform interface cable wiring – Fairbanks Aegis Industrial Mild Steel User Manual
Page 13
Advertising

Section 3: Scale Installation
08/12
13
51102 Rev. 7
INSTALLATION, CONTINUED
6. The scale is shipped with the threaded legs of the feet up tight against the load
cells. Remove the plugs at the corners of the scale and turn the feet clockwise a
minimum of four (4) complete turns with a large screwdriver.
7. Wire the scale cable to the proper type indicator, as shown in the chart below.
8. Once the scale platform is completely wired to the indicator, calibrate the unit.
─
Follow the appropriate indicator service manual to ensure a good calibration.
Platform Interface Cable Wiring
WIRE COLOR
FUNCTION
Black
(
─
) Excitation
Red
(+) Excitation
Yellow
Shield
Green
(+) Signal
White
(
─
)Signal
Advertising