Load cell replacement steps, Important precaution, Do not cut or shorten any lo ad cell cables – Fairbanks Aegis Drum Scales User Manual
Page 21
Advertising

Section 4: Service & Maintenance
04/10
21 51190 Rev. 2
4.2.3. Load Cell Replacement Steps
NOTE:
Torque the two (2) Load Cell Fastening Bolts to
90 ft/lbs
when replacing
them.
1. Lift the scale on its end.
2. Unscrew the two (2) 7/16” bolts and open the Load Cell Wiring Panel.
3. Locate and cut the defective Load Cell Interfacing Cable connection.
4. Remove the two bolts securing the damaged Load Cell to its mounting block.
5. Remove the Load Cell from the Platform.
6. Make a note of the cable routing design and the wiring connections.
C A U T I O N
ALWAYS
remove power from the Instrument before servicing.
IMPORTANT PRECAUTION
DO NOT CUT OR SHORTEN ANY
LO AD CELL CABLES!
Advertising