Initial setup – Robinair AC375C Refrigerant Recovery, Recycle, Recharge Unit User Manual

Page 15

Advertising
background image

Recover/Recycle/Recharge Unit

13

RECOVER XX.XXKG

Adding Refrigerant to the Internal Storage Vessel contd.

12. Do the following to clear the service hoses:

a. Press the Menu key (

) to:

b. Press the Start/Stop key ( ) to start hose clearing.

c. Watch the low-side gauge. When gauge pressure reaches 34 kPa

(10 in. Hg) vacuum, press the Start/Stop key ( ) to stop the clearing
process.

13. Close the low-side panel valve.

Drain Oil

1. On the control panel, open the oil drain valve.

2. Watch the oil drain into the oil drain bottle. When oil stops draining, close

the oil drain valve.

3. Press the Start/Stop key ( ) to exit the recover function.

The initial setup is now complete.

Initial Setup

Advertising