Installation, Compact installation only – LiftMaster RSW12V Residential / Light Commercial Swing Gate Operator with Battery Backup User Manual

Page 13

Advertising
background image

12

INSTALLATION

» COMPACT INSTALLATION ONLY

DETERMINE LOCATION FOR CONCRETE PAD
AND OPERATOR

DO NOT run the operator until instructed.
Refer to the illustration to determine the measurements and location of the
concrete pad.
NOTE: When lifting the operator use the handle to avoid damaging the operator.

26-1/2"

9"

Output Shaft Center

28"

24"

Gate Hinge Center

TOP VIEW OF OPERATOR AND GATE

Gate Open 90°

CONCRETE PAD AND OPERATOR ATTACHMENT

Check the national and local building codes before installation.

Install the electrical conduit.

Pour a concrete pad (reinforced concrete is recommended). The concrete pad
should be 6 inches above the ground and deeper than the frost line.

Secure the operator to the concrete pad with appropriate fasteners.

NOTE: An alternative to a concrete pad is to post mount the operator (refer to
accessories).

1
2
3

4 Concrete Anchors

1/2" x 3 1/2"

6" Above Ground

28"

24"

1

3

2

Below the frost line.

Check all national and

local codes.

14"

12.2"

13.6"

17"

MOUNTING FOOTPRINT

Advertising