1 test progress bar, 2 test status, 4 pause testing – Teledyne LeCroy BPT - Users Manual User Manual

Page 24: 5 resume testing, 6 stop testing, Test progress bar test status, Pause testing resume testing stop testing

Advertising
background image

18

CATC BPT 1.00

C

HAPTER

5

User’s Manual

Running Tests

The first test will run on the first device in the Device column; when that test is complete,
the second test (if any) will run on the device, and so on with all specified tests. When all
tests have completed on the first device, testing will continue in the same manner on the next
device in the Device column, until either all tests have been run on all devices, or the
operator presses the Stop or Pause button.

5.3.1 Test Progress Bar

While tests are executing, the Test Progress bar shows the percentage of testing that has
completed for all tests and devices.

5.3.2 Test Status

During test execution, the left side of the Status bar reports the BD_ADDR of the device
being tested and the name of the test that is currently running.

5.4 Pause Testing

After test execution has begun, the Start button changes to a Pause button.
At this time, the testing may be paused by pressing the Pause button.

When the Pause button is pressed, the Test Progress bar reads “Pausing
Tests...” while the BPT pauses test execution, then changes to “Testing
Paused” after test execution has paused.

5.5 Resume Testing

If testing is Paused, the Pause button changes to the Resume button.
Pressing the Resume button causes the testing to continue where it left off.

5.6 Stop Testing

At any time during test execution, testing may be stopped by clicking the
Stop button. This will stop the current test and also will prevent any
subsequent tests in the list from executing. Tests may also be stopped after
the testing has been paused.

Figure 5-5: Test progress

Figure 5-6: Status bar display during testing

Advertising