Vanguard TTRA-S2 (ATRT-03 S2, ATRT-03A S2, ATRT-03B S2, Tri-Phase) User Manual

Page 40

Advertising
background image

TTRA-S2 VERSION 1.x SOFTWARE MANUAL

REV 2

37

8. Click on the “OK” button. An untitled test plan with the selected parameters will be

created and displayed as shown below:

9. Enter the header information in the corresponding input fields.

10. If you had entered a number other than 0 for additional tests, enter the values for each

additional test row (H Voltage, X Voltage, H Tap, and X Tap). You can also modify any of
the H Voltage, H Tap, X Voltage, and X Tap values in the other rows by clicking on the
corresponding cell and entering the new value.

11. Select the LTC type from the “Type:” drop-down list. If applicable, select the group from

the “Group:” drop-down list.

12. Enter the maximum deviation percentage in the “Max Dev. %” input field.

13. Select the test voltage from the “Voltage:” drop-down list.

14. Save the test plan (see section 5.4).

Advertising