Operating Procedures

VBT-80P

11

6.0 OPERATING PROCEDURES

(

Refer to tables 3 through 8)

WARNING

Always connect the VBT-80P ground to the substation ground first.

6.1 Run Test Procedure

The following test procedure describes the steps required to run a test

Table 3 Run Test Procedure

STEP

ACTION

DISPLAY

3-1

None. VBT-80P Main menu.

3-2

To begin the RUN TEST procedure, press
key # 1 (RUN TEST) on the MAIN
MENU.

The

Te

s

t

Dur

a

t

i

on”

me

nu

appears.

3-3

Select a test time duration. Press key # 1
to select 5 seconds for this example.The

Te

s

t

Vol

t

age”

me

nu

a

ppea

r

s

.

Note

Test voltage can be selected in the 1KV
steps.

3-4

Key in the test voltage using the the 0-9
keys.

3-5

Pr

e

s

s

t

he

Ent

e

r

key

t

o

c

onf

i

r

m

t

he

e

nt

r

y.

The

Cur

r

e

nt

Thr

e

s

hol

d”

me

nu

a

ppea

r

s

.

3-6

Select a current threshold. Press key # 1 to
select 300uA for this example.
The

Te

s

t

par

a

me

t

er

s

di

s

pl

ay

a

ppe

a

r

s

.

1.RUN TEST

07/06/06

2.SETUP

16:22:01

1. 5 SEC.

2. 10 SEC

3. 30 SEC

4. 60 SEC

5. 2 MIN

ENTER TEST VOLTAGE:

(10 to 80)

0 KV

ENTER TEST VOLTAGE:

(10 to 80)

61 KV

1. 300uA
2. 200uA
3. 100uA

TEST PARAMETERS:
61KV

5 SEC

300uA

“CLEAR”

TO

CHANGE

OR

“ENTER”

TO

CONTI

NUE