Zrc top load rebuild procedure – Warner Electric ARC Clutch_ZRC Top Load User Manual
Page 11

Warner Electric • 800-825-9050
P-2019 • ARC 11
Remove grease zerk using open-end wrench. See
Figure 47.
Figure 48
ZRC
Top Load Rebuild Procedure
Remove spring adjustment rings using two
spanner wrenches (YTL3-0009) and soft hammer.
See Figure 48.
Figure 49
Remove upper spring cover(if applicable), spring,
and lower spring cover (if applicable) from top-
load assembly. See Figure 49.
Figure 50
Place top-load in vice, clamping on flats. Using
YTL3-0005 and a soft hammer, loosen spindle
adapter (if applicable) and remove. See Figure 50.
Figure 51
Continue to hold top-load in vice, clamping on flats.
Using a socket and breaker bar, loosen the nut
inside top-load assembly. See Figure 51.
Figure 52
Remove the nut inside top-load assembly. See
Figure 52.
Figure 53