Faucet installation, Connecting supply hoses – Waterstone BRIDGE FAUCETS 6350 User Manual

Page 3

Advertising
background image

F

F

1.

2.

3.

4.

COUNTER

OR SINK

A

B

C

C

A

B

E

D

D

1. Before connecting supply hoses, flush supply stops to clear any debris. Place a bucket underneath stops
and run water for 5 to 10 seconds. Turn water off.
2. Carefully position hot and cold supplies so they will not interfere with other hoses.
3. Connect supply hoses (A) to supply stops (B). DO NOT use teflon tape or plumbers putty. Turn water
back on and check for leaks.

Slide washer and thread the clamp nut onto threaded shroud.
Tighten nut snug to underside of sink or counter.

Securely tighten clamp screws (F).

FAUCET INSTALLATION

Remove clamp nut (A) and washer (B) from threaded shroud (C).

Fit flexible hoses (D) and rigid sidespray tube (E) through holes on
counter or sink. (No plumbers putty is required. O-rings seals base).

CONNECTING SUPPLY HOSES

A

B

Advertising