Step nine step eight step seven – WEATHER GUARD 1200 User Manual

Page 5

Advertising
background image

Page 5 of 8

Place mounting pads, Part H, on top of

the truck bed rails. Cut the notch into the

mounting pad. Place the front assembly,

from Step Six, onto the truck with the

notched ends approximately 1/8" from the

front of the truck bed.

NOTE: Some truck beds will not allow

the notch to travel all the way forward.

PART H

PART J

Sliding the clamp assembly, Part J, into

the front assembly, place them as far away

from each other and as close to the ends

of the mounting rails as possible. Clamps

can not be more than 9.5" from either end

of the mounting rail. Clamp blocks, Part

K, are to be flush with the steel underside

of the bed rail. Using a torque wrench,

tighten the 3/8-16 fasteners in the clamp

assembly to 10 foot pounds.

PART K

Place clamp block, Part K, on the

threaded end of the clamp assembly,

Part J. The clamp block has an offset

hole. The thick side should face in to-

wards the clamp. Use the thin side if

extra clearance is needed.

STEP NINE NOTE: For Ford F250/

350 and some Dodge Dakota vehicles

place the front assembly 3" from front

of truck bed. Hold the clamp assem-

bly, Part J, in place and slide the

mounting rail into the clamp until it is

1/8" from the front of the truck.

STEP NINE

STEP

EIGHT

STEP

SEVEN

1/8"

Clamps can not be

more than 9.5" from

either end of the

mounting rail.

IMPORTANT!

Advertising
This manual is related to the following products: