7 battery installation – IEI Integration UPC-12AH_GM45 v1.00 User Manual

Page 50

Advertising
background image

UPC-12A/GM45 Panel PC

Page 38

Figure 4-5: HDD Installation

Step 7:

Reinstall the bottom panels

. Make sure the bottom panels are properly

secured with the previously removed retention screws.

Step 0:

4.7 Battery Installation

The UPC-12A/GM45 is come with a battery for system backup power. To install the

battery, follow the steps below.

Step 1:

Remove the HDD/battery access panel

. The HDD/battery access panel is

secured to the rear panel with eight retention screws. Remove the retention

screws to remove the HDD/battery access panel.

Advertising
This manual is related to the following products: