0 - 5 volt field calibration procedure, Equipment required, Setup and calibration – Watlow Series 985 User Manual

Page 40: Iimportant

Advertising
background image

NOTE:

Not all parameters

will appear. They

are dependent on
your unit type. Use
only the steps that
apply to your unit.

0 - 5 Volt Field Calibration Procedure

Equipment Required

l

Precision voltage source 0-5 volt minimum range with 0.001 volt

resolution.

Setup And Calibration

NOTE

1.

2.

3.

Before calibration on an installed control, make sure all data and

parameters are documented. See Setup and Operation Charts,

Pages 26 and 28.

Connect the AC line voltage Ll to

Terminal #14,

L2 to Terminal #7, and

Ground to Terminal #8. Jumper for correct line voltage. See Chapter 2.

Connect the voltage/current source to Terminal #15 and #17 on the

Series 980/985 terminal strip. Use regular 20 - 24 gauge wire.

Apply power to the unit and allow it to warm up for 15 minutes. After

warm-up

put the unit in the CAL menu. See Figure 33 on Page 37.

Press the MODE key until the OU prompt is displayed.

IIMPORTANT:

When the MANUAL LED Is ON the unit is automatically calibrating. Your
sequence is VERY important. Always move to the next prompt before
changing the calibration equipment.

4.

5.

6.

Press the AUTO/MAN key twice to enter the MANUAL mode. The unit is

calibrating when the MANUAL LED is ON.

At the OU prompt, set the voltage/current source to 0.00 volts. Allow at

least 10 seconds to stabilize. Press the MODE key.

At the 5U prompt, set the voltage/current source to 5.00 volts. Allow at

least 10 seconds to stabilize. Press the AUTO/MAN key twice to exit the
MANUAL mode. This pauses calibration to allow you to exit the CAL
mode.

40

WATLOW Series 980/985 User’s Manual

Appendix

Advertising