Figure 1 figure 2 – Wright Serial #55142 and higher User Manual

Page 28

Advertising
background image

26

Machine Preparation
1.

Park machine on a level surface and set brake.

2.

Remove ROPS and hardware from shipping box and identify all parts using the parts

list noted above.

Lower ROPS Leg Tube Installation
3.

Jack and secure rear of mower and remove rear tires.

4.

Remove left side rear fuel tank bracket bolts. Support tank.

5.

Place LH leg weldment against LH machine frame mounting location.

6.

Secure using (3) 7/16-14NC x 1.25” long hex head bolts, (3) 7/16-14NC nylock hex
nuts, (3) 3/8-
16NC x 1.25” long hex head bolts and (3) 3/8-16NC nylock hex nuts. Tighten bolts
and nuts later in
these instructions. See Figure 1.

7.

Loosen high pressure hoses at the pump and swivel away from LH leg weldment.








8

Remove right side rear fuel tank bracket bolts. Support tank.

9

Repeat step 5-7 for installing RH leg weldment to RH side of machine frame
mounting location.
See figure 2.








Upper ROPS Hoop Installation
10. Install upper roll bar hoop assembly. Secure each side of hoop with (1) ½-13NC x

3.00” long hex head bolt, (1) pin retainer washer and (1) ½-13NC center locking
hex nut, into the upper mount hole of the hoop bracket. Tighten only until the nut
makes contact with the hoop bracket. Do not over tighten. Hoop should pivot
freely up and down. See Figure 3.

11. Install (1) EPDM washer onto each hitch pin. Position the top hoop into the up-

right position and insert hitch pins. See Figure 3.

Figure 1

Figure 2

Advertising